Highlighted project

Greater Gabbard project (2009) Greater Gabbard project (2009)
The Greater Gabbard Offshore Wind Farm development comprises an offshore wind farm off the Suffolk coast (adjacent to two sand banks known as Inner Gabbard and Galloper) and associated electrical infrastructure, both onshore and offshore, to produce a maximum installed capacity of 500 MW.
Read more ยป

Our clients

IHC Merwede

Onshore

The diversity of markets for the Onshore activities are remarkable. Rope Access demonstrates to be a efficient method to perform specific tasks at height or difficult accessible locations which can be used within many different sectors.

Installation, Repair, Maintenance and Inspection activities for the Maritime Industry, Heavy Industry, Renewable Energy and even the Amusement Market such as theme parks can be executed. By using rope access a safe, efficient and cost effective working method will occur.

IMCAIRATAVCAISO 9001FPALJQS/27923