Release Fishing Vessel from F2 Hanze (2011)

Bluestream Diving B.V. has safely released a Fishing Vessel which was stuck in a messenger line of the F2 Hanze platform.

During the execution of the workscope on the riser and spool piece installation for Chevron Transportation B.V., Bluestream was contacted by Dana Petroleum with the request to release the Skandi Inspector from her current work and assist in an emergency situation. A Fishing Vessel had entered the 500m zone of the F2 Hanze platform and had caught a Dyneema messenger line with it’s propeller.

With the use of divers Bluestream released the Fishing Vessel from the messenger wire, whilst preventing any oil spillage from TMLS loading hose. On completion the Skandi Inspector returned to her previous work.

Projectinformation

Client:Dana Petroleum
Date:May 2011
Projectscope:Release Fishing Vessel from F2 Hanze (2011)
Type project:Diving
Contact:Mark Waltman
Phone:+31 (0)223 63 77 84
IMCAIRATAVCAISO 9001FPALJQS/27923