Renewables
Highlighted project
Greater Gabbard Anode Ring Installation Project (2011)Bluestream ROV B.V. has safely completed an installation with the Saab Seaeye Cougar XT for Seaway Heavy Lifting Engineering in the Greater Gabbard Windfarm. Seaway Heavy Lifting Engineering has been awarded a project for Fluor, to install a meteo mast to monitor the environmental conditions at this specific location . For this project the brand new Oleg Strashnov was used.
Read more ยป
Installation support of offshore wind foundations
Bluestream offshore has supported the installations of steel jackets and monopiles from Heavy Lift vessel “The Stanislav Yudin” for Seaway Heavy Lifting.
Our services include the following:
- Provision of procedures during the design phase
- Pre-installation survey including debris sweep;
- Survey pre-laid export power cables
- Survey jacket mud mat penetration for jacket level
- Assistance with stabbing of piles into jacket pile sleeves
- Assistance during grouting operations, including removal of grout lines.
- Debris removal
- Detailed depth surveys
- Anode survey
- Mattress installation
- Post-installation surveys
- Final reporting
We are accustomed to the environmental circumstances which are typical for Offshore Wind farms; strong tidal currents, poor visibility and high waves. Our people are our most valuable assets. In the end, they make the difference onboard and determine the success of a project.